Quick answer
There are two ways to fence a sloping block. A stepped fence keeps each panel level and steps down the slope, with plinths filling the triangular gaps underneath; it suits COLORBOND. A raked fence follows the ground in a smooth line with no gaps; it suits timber and some slat systems. Where the ground on each side differs a lot, a retaining wall goes in first.
Key takeaways
- Stepped fences keep panels level and suit COLORBOND; raked fences follow the ground and suit timber.
- Plinths close the gaps under a stepped fence and usually add $20 to $45 per metre.
- In NSW, an exempt 1.8m fence that is stepped on a slope may be up to 2.2m high at each step.
- A fence is not a retaining wall. Where soil levels differ by more than a plinth can hold, build a proper wall first.
- Retaining walls over 600mm, or within 1m of a boundary, generally need approval and often engineering.
What Is the Best Way to Fence a Sloping Block?
The best way to fence a sloping block depends on the slope and the material. On gentle to moderate slopes, a stepped COLORBOND fence with plinths underneath is the most common choice. On uneven slopes, or with timber, a raked fence that follows the ground leaves no gaps. Steep boundaries usually need a retaining wall first.
| Factor | Stepped fence | Raked fence |
|---|---|---|
| How it looks | Level panels in steps | A smooth line following the ground |
| Gaps underneath | Triangular gaps, filled with plinths | None, or very small |
| Best materials | COLORBOND, slat panels | Timber paling, some slat and steel |
| Best slopes | Even, gentle to moderate | Uneven or gentle slopes |
| Extra cost | Plinths, about $20 – $45 /m | Extra cutting and labour |
| Top line | Steps up and down | Parallel to the ground |
Scroll sideways to see the full table.
Many Campbelltown suburbs sit on rolling ground. Glen Alpine, Kentlyn and Minto Heights are genuinely undulating, and many blocks in St Helens Park, Bradbury and Ambarvale fall across the fence line. The right choice is usually clear once the slope is measured on site.
What Is a Stepped Fence?
A stepped fence is made of level panels that step down the slope like a staircase. Each panel sits level between two posts, and at each post the next panel drops to follow the ground. The triangular gaps that open under each panel are closed with plinths of concrete, steel or treated timber.
Stepping is the standard way to build a COLORBOND fence on a slope, because the steel sheets and rails are made to sit square. It keeps the fence looking crisp and uniform, and each panel is easy to replace later. The steps are usually set at each post, so the size of each step depends on the slope and the panel width.
- Looks: neat and architectural, especially on even slopes
- Gaps: triangles under each panel, closed with plinths
- Height: the fence is taller on the low side of each step
- Best for: COLORBOND, aluminium slat panels and pool fence panels
Step height and the rules
In NSW, a standard 1.8m boundary fence that is stepped to suit a slope can generally be up to 2.2m high at each step and still be exempt development. Where the limit is 1.2m, such as front fences, each step can generally be up to 1.5m.
What Is a Raked Fence?
A raked fence follows the slope in a smooth, continuous line, with the rails running parallel to the ground and the top of the fence at an even height above it. Timber paling fences are easy to rake because each paling can be cut to length. COLORBOND can be raked, but the sheets must be cut on an angle, which takes more labour.
Raking avoids the triangular gaps of a stepped fence, so there is nothing for a small dog to squeeze under and no plinths to buy. It suits uneven slopes, where steps would be irregular, and long boundaries that rise and fall. The top line follows the ground, which some owners prefer and others find less tidy than level steps.
- Looks: flowing and natural, following the land
- Gaps: none, or very small at the bottom
- Height: even along the whole fence
- Best for: timber paling, post and rail, some steel and slat systems
Stepped or Raked: Which Should You Choose?
Choose a stepped fence for COLORBOND or slat panels on an even slope, when you like a crisp, level look. Choose a raked fence for timber, for uneven or rolling ground, or when you want no gaps underneath. On a steep or very uneven boundary, combine a retaining wall with either style.
Even, gentle slope
Stepped COLORBOND with plinths. Tidy, uniform and the most common choice in newer estates.
Rolling or uneven ground
A raked timber fence follows dips and rises without odd-sized steps.
Pets that squeeze through
Raked, or stepped with plinths fitted tight to the ground.
Big drop between yards
A retaining wall first, then a fence on or behind it.
Material matters too. If you prefer COLORBOND for its low maintenance and long life, a stepped fence is the natural fit. If you prefer timber, raking comes easily. Our Colorbond vs timber guide compares the two materials in detail.
How Do You Fill the Gaps Under a Fence on a Slope?
The gaps under a stepped fence are filled with plinths: concrete sleepers, steel plinth panels or H4 treated timber boards fixed between the posts at the bottom of each panel. Plinths stop pets, close gaps for privacy and hold back a little soil. In Campbelltown they typically add $20 to $45 per metre.
| Plinth | Typical cost | Notes |
|---|---|---|
| Concrete sleeper plinth | $25 – $45 per metre | Strong, long-lasting, common under COLORBOND |
| Steel plinth or kickboard | Quoted on site | Matches COLORBOND colours |
| H4 treated timber plinth board | $20 – $40 per metre | Common under timber fences |
Scroll sideways to see the full table.
A plinth is not a retaining wall
Plinths can hold back a small amount of soil, but they are not designed to retain garden beds or a raised yard. Soil piled against a fence or plinth pushes it over, traps water and rusts or rots the base. Where levels differ by more than a little, build a retaining wall.
When Do You Need a Retaining Wall Before a Fence?
You need a retaining wall before a fence when the ground on one side of the boundary is noticeably higher than the other, or when the slope would leave steps too big for plinths to close. In NSW, a retaining wall is generally exempt only if it is no higher than 600mm and at least 1m from the boundary.
That second condition is important: most retaining walls needed for a fence sit on or near the boundary, so they usually aren’t exempt development and need approval from council or a complying development certificate. Walls over 600mm, or that support a building, a driveway or a fence, often need a structural engineer’s design to AS 4678, the Australian Standard for earth-retaining structures.
| Wall type | Price per metre | Best for |
|---|---|---|
| Timber sleeper | $220 – $450 | Garden beds and lower walls |
| Concrete sleeper, galvanised steel posts | $280 – $560 | Most backyard boundary walls |
| Concrete block (besser), core-filled | $340 – $700 | Taller, engineered walls |
Scroll sideways to see the full table.
Engineering design and certification, when required, typically costs $600 to $1,500. See options and prices on our retaining walls page.
Can You Put a Fence on Top of a Retaining Wall?
Yes, but the wall must be designed for it. A fence on top of a retaining wall adds wind load, so the posts need to be fixed into the wall structure, set behind it, or carried down to their own footings. Councils also look at the combined height of the wall and the fence where they sit on a boundary.
- Concrete sleeper walls: the fence posts can often continue up from the wall’s steel posts, if the wall is designed for it
- Block walls: posts are core-filled or bolted into the top of the wall
- Separate footings: on lower walls, fence posts can be set just behind the wall
- Height: where a wall and fence combine on the boundary, check the combined height with council before building
A COLORBOND fence on top of a new retaining wall typically costs $110 to $160 per metre on top of the wall price. Ask for the wall and fence to be designed and quoted together, so the posts, footings and drainage work as one system.
How Do You Stop Water Damaging a Fence on a Slope?
Water is the main enemy of fences on sloping blocks. Keep soil and mulch off the bottom of the fence, leave gaps or weep holes so water isn’t dammed against plinths, and behind any retaining wall install an ag drain in gravel wrapped in filter fabric. Direct downpipes and run-off away from the fence line.
- Don’t let the uphill neighbour’s garden bed sit against the fence or plinth
- Allow water to pass under or through the fence line instead of pooling behind it
- Behind retaining walls, use an ag pipe in gravel with filter fabric to drain the soil
- Check where downpipes and stormwater run before setting posts
- In clay soils, footings deep enough for the ground stop posts leaning over time
Reactive clay is common in older parts of Campbelltown, such as Ruse, Airds and Bradbury. It swells when wet and shrinks when dry, which moves shallow posts. On a slope, that movement is worse on the downhill side, so footing depth matters even more.
Who Pays for a Fence and Retaining Wall on a Sloping Boundary?
Neighbours usually share the cost of a sufficient dividing fence under the Dividing Fences Act 1991 (NSW). A retaining wall is treated differently: Legal Aid NSW explains that if the wall is needed to support the dividing fence, the Act applies and the cost is generally shared, supported by a structural engineer’s evidence. Otherwise the Act doesn’t apply.
Retaining wall costs are a common source of neighbour disputes, because walls are expensive and the need for them often comes from earlier cut and fill on one side. Talk early, get an itemised quote that separates the wall, the plinths and the fence, and put any agreement in writing. Our guide Who Pays for a Boundary Fence in NSW? explains the fencing notice process.
How Much Does It Cost to Fence a Sloping Block?
Fencing a sloping block in Campbelltown usually costs the standard fence price plus $20 to $45 per metre for plinths or extra cutting. A 30m stepped COLORBOND fence with concrete plinths costs about $3,500 to $5,400 installed. If a retaining wall is needed first, add $280 to $560 per metre for a concrete sleeper wall.
Example 1: 30m stepped Colorbond fence with plinths
A side boundary in Glen Alpine falls about 1.5m over 30 metres. The fence is stepped at each post, with concrete sleeper plinths under each panel and the old fence removed.
- 30m COLORBOND, 1.8m, stepped
- $2,760 – $4,050
- Concrete plinths, 30m
- $750 – $1,350
- Remove the old fence
- $600 – $1,200
- Total job
- $4,110 – $6,600
Example 2: 15m concrete sleeper wall with a fence on top
A rear boundary in Minto Heights where the neighbour’s yard is about 800mm higher. A concrete sleeper wall goes in first, designed by an engineer, with a COLORBOND fence on top.
- 15m concrete sleeper wall
- $4,200 – $8,400
- Engineer design and certification
- $600 – $1,500
- 15m COLORBOND on the wall
- $1,650 – $2,400
- Total job
- $6,450 – $12,300
Ranges are wide because the slope, soil, access and whether the wall needs approval all change the price. Our 2026 fencing cost guide lists prices for every fence type.
How Is a Fence Installed on a Sloping Block?
A fence on a sloping block is installed by measuring the fall along the boundary, deciding whether to step or rake, setting out post positions so the steps are even, building any retaining wall first, setting posts in concrete, then fitting panels or palings with plinths or raked rails, and finishing with drainage and clean-up.
Measure the fall
The installer measures how much the ground drops along the fence and between the two yards.
Plan steps or rake
Post positions are set out so steps are even, or the rake angle is worked out.
Retaining wall first
Where needed, the wall is approved and built before the fence.
Set the posts
Posts go in concrete to the right depth for the slope and soil.
Fit panels and plinths
Panels or palings are fixed, with plinths or raked rails closing the gaps.
Drainage and clean-up
Water paths are checked, offcuts removed and the line walked with you.
Frequently Asked Questions
Can a Colorbond fence be raked instead of stepped?
Yes, but it is less common. The sheets have to be cut on an angle and the rails set to follow the slope, which takes more labour and costs more. Most COLORBOND fences on slopes are stepped with plinths, which keeps the panels square.
How big can each step in a stepped fence be?
It depends on the slope and post spacing. For the fence to stay exempt development in NSW, a 1.8m fence stepped on a slope can generally be no more than 2.2m high at each step. Large steps also need bigger plinths, so a steep slope may suit a retaining wall better.
Does a fence on a sloping block need council approval?
Often not, if it meets the exempt development rules, including the 2.2m limit at each step. A retaining wall on or near the boundary usually does need approval. Check with Campbelltown City Council or read our guide on council approval for fences.
Can I use my fence to hold back soil?
No. Fences and plinths are not designed to retain soil. Soil piled against a fence pushes it over and traps moisture that rusts steel and rots timber. Where levels differ, build a proper retaining wall.
How do pool fences work on a slope?
Pool fence panels are stepped like other panels, and the gap under each panel, measured at its lowest point, must not exceed 100mm. Where the ground falls steeply, panels may need to be set lower or a plinth added to keep the gap compliant.
Sources
- Exempt development: fences (NSW Planning Portal) (opens in a new tab)
- Earthworks, retaining walls and structural supports (NSW Department of Planning) (opens in a new tab)
- Fences: rules for exempt and complying development (Wentworth Shire Council fact sheet) (opens in a new tab)
- Fences, boundaries and retaining walls (Legal Aid NSW) (opens in a new tab)